Extensional RC drilling commenced at Lord Byron
✦ NabkaNews BriefAuto-summarized from multiple outlets · verify with the source
Drilling has started at the Lord Byron site, with extensional reverse circulation (RC) drilling underway. This development is a new step at the location. The specifics of the drilling operation are not detailed beyond its commencement.