HS2 reset to cost £153m and slower trains ‘won’t save money’
✦ NabkaNews BriefAuto-summarized from multiple outlets · verify with the source
A revised plan for a railway project, potentially including a tunnel, is being considered. The revised plan is reported to cost £153m and may not achieve cost savings through the use of slower trains. There are also calls for a pause in the project until its deliverability can be confirmed.